Hokuriku Shinkansen


































































Hokuriku Shinkansen

Shinkansen-E.svgShinkansen jrw.svg

W7 series set W3 20150207.jpg
A JR West W7 series train on the Hokuriku Shinkansen

Overview
Native name 北陸新幹線
Type Shinkansen
Status Operational
Locale
Tokyo; Saitama, Gunma, Nagano, Niigata, Toyama, Ishikawa, and Fukui Prefectures
Termini
Takasaki
Kanazawa
Operation
Opened 1 October 1997
Operator(s)
JR logo (east).svg JR East, JR logo (west).svg JR West
Depot(s) Nagano, Hakusan
Rolling stock
E7 series, W7 series
Technical
Track gauge
1,435 mm (4 ft 8 12 in)
Minimum radius 4,000 m
Electrification 25 kV AC, 50/60 Hz, overhead catenary
Operating speed 260 km/h (160 mph)



Route map

Hokuriku Shinkansen

The Hokuriku Shinkansen (北陸新幹線) is a high-speed shinkansen railway line jointly operated by East Japan Railway Company (JR East) and West Japan Railway Company (JR West), connecting Tokyo with Kanazawa in the Hokuriku region of Japan. The first section, between Takasaki and Nagano in Nagano Prefecture, opened on 1 October 1997, originally called the Nagano Shinkansen (長野新幹線) (Takasaki is linked to Tokyo by the Joetsu Shinkansen). The extension to Toyama in Toyama Prefecture and Kanazawa in Ishikawa Prefecture opened on 14 March 2015.[1] Construction of a further section onward to Fukui and Tsuruga in Fukui Prefecture commenced in 2012, with scheduled opening in fiscal 2022. The route of the final section to Shin-Osaka was decided on 20 December 2016 as the Obama - Kyoto route,[2] with construction expected to begin in 2030 and take 15 years.




Contents






  • 1 Train names and service patterns


  • 2 Stations


    • 2.1 Notes




  • 3 Rolling stock


    • 3.1 Former rolling stock




  • 4 History


    • 4.1 Nagano Shinkansen


    • 4.2 Extension beyond Nagano


    • 4.3 Test-running




  • 5 Future plans


    • 5.1 Interim plans




  • 6 Conventional lines running parallel to the Hokuriku Shinkansen


  • 7 References


  • 8 External links





Train names and service patterns


Since March 2015, services on the line are split into four types, with train names as listed below.[3] Trains operate over the Joetsu and Tohoku Shinkansen tracks between Tokyo and Takasaki.




  •      Kagayaki: Tokyo - Kanazawa, limited-stop service, since 14 March 2015


  •      Hakutaka: Tokyo - Kanazawa, mostly all-stations service, since 14 March 2015


  •      Tsurugi: Toyama - Kanazawa, all-stations shuttle service, since 14 March 2015


  •      Asama: Tokyo - Nagano, mostly all-stations service, corresponding to existing Nagano Shinkansen service introduced in 1997


The original Nagano Shinkansen Asama services, introduced in 1997, replaced the conventional Shin'etsu Main Line limited express services, also named Asama, which previously took 2 hours 50 minutes from Tokyo (Ueno Station) to Nagano. Following the opening of the Shinkansen, part of the conventional line was abandoned between Yokokawa and Karuizawa. This section included the steeply-graded Usui Pass which required the use of bank engines on all trains.



Stations
















































































































































































































Station name
Japanese
Distance from Takasaki (km)
Transfers
Location

Tohoku Shinkansen

Tokyo
東京 -108.6



  • Shinkansen jrc.svg Tokaido Shinkansen


  • JC Chūō Line


  • JK Keihin-Tōhoku Line


  • JE Keiyō Line


  • JO Yokosuka Line


  • JO Sōbu Line (Rapid)


  • JT Tōkaidō Main Line


  • JU Ueno–Tokyo Line (Utsunomiya, Takasaki, and Jōban Lines)


  • JY Yamanote Line


  • M Tokyo Metro Marunouchi Line (M-17)



Chiyoda
Tokyo

Ueno
上野 -105



  • JJ Jōban Line (Rapid)


  • JK Keihin-Tōhoku Line


  • JU Takasaki Line


  • JU Utsunomiya Line


  • JY Yamanote Line


  • G Tokyo Metro Ginza Line (G-16)


  • H Tokyo Metro Hibiya Line (H-17)


  • KS Keisei Main Line (Keisei Ueno)




Taitō

Ōmiya
大宮 -77.3



  • Shinkansen-E.svg Tohoku Shinkansen


  • JK Keihin-Tōhoku Line


  • JA Saikyō Line


  • JS Shōnan-Shinjuku Line


  • JU Takasaki Line


  • JU Utsunomiya Line


  • Kawagoe Line


  • New Shuttle


  • TD Tobu Urban Park Line



Ōmiya-ku, Saitama
Saitama

Joetsu Shinkansen
Ōmiya 大宮 Ōmiya-ku, Saitama Saitama

Kumagaya
熊谷 -40.7



  • Chichibu Main Line


  • Takasaki Line




Kumagaya

Honjō-Waseda
本庄早稲田 -19.6
Honjō

Takasaki
高崎 0.0



  • Joshin Electric Railway Line


  • Agatsuma Line[* 1]


  • Hachiko Line


  • Joetsu Line


  • Ryomo Line[* 1]


  • Shinetsu Main Line


  • Takasaki Line



Takasaki
Gunma
Hokuriku Shinkansen
Takasaki 高崎 Takasaki Gunma

Annaka-Haruna
安中榛名 18.5
Annaka

Karuizawa
軽井沢 41.8
Shinano Railway Symbolmark.svg Shinano Railway Line

Karuizawa, Kitasaku

Nagano

Sakudaira
佐久平 59.4
Koumi Line

Saku

Ueda
上田 84.2



  • Shinano Railway Symbolmark.svg Shinano Railway Line

  • Ueda Electric Railway Bessho Line




Ueda

Nagano
長野 117.4



  • Iiyama Line[* 2]


  • Shinetsu Main Line


  • Shinano Railway Symbolmark.svg Shinano Railway Kita-Shinano Line


  • NER-mark.svg Nagano Electric Railway Nagano Line




Nagano

Iiyama

飯山
147.3

Iiyama Line

Iiyama

Jōetsumyōkō

上越妙高
176.9

Echigo-TOKImeki logomark.svg ETR Myōkō Haneuma Line

Jōetsu

Niigata

Itoigawa

糸魚川
213.9




  • Ōito Line


  • Echigo-TOKImeki logomark.svg ETR Nihonkai Hisui Line




Itoigawa

Kurobe-Unazukionsen

黒部宇奈月温泉
253.1

Toyama Chihō Railway Main Line

Kurobe

Toyama

Toyama

富山
286.9



  • Takayama Main Line


  • Ainokaze Toyama Railway logo.png Ainokaze Toyama Railway Line


  • Toyama Light Rail Toyamako Line (Toyamaeki-Kita


  • Toyama Chiho Railway Fujikoshi Line, Main Line, Tateyama Line (3 lines at Dentetsu-Toyama)


  • Toyama City Tram Line (Toyama-Ekimae)




Toyama

Shin-Takaoka

新高岡
305.8

Jōhana Line

Takaoka

Kanazawa

金沢
345.4




  • Hokutetsu Asanogawa Line (Hokutetsu-Kanazawa)


  • Hokuriku Main Line


  • Ir ishikawa logo.png IR Ishikawa Railway Line


  • Nanao Line




Kanazawa

Ishikawa

Under construction; scheduled to open in fiscal 2022

Komatsu

小松
372.6

Hokuriku Main Line

Komatsu

Ishikawa

Kagaonsen

加賀温泉
387.2

Hokuriku Main Line

Kaga

Awaraonsen

芦原温泉
403.4

Hokuriku Main Line

Awara

Fukui

Fukui

福井
421.4



  • Katsuyama Eiheiji Line

  • Mikuni Awara Line


  • Fukubu Line (Fukui-eki)


  • Etsumi-Hoku Line (Kuzuryū Line)


  • Hokuriku Main Line




Fukui

Nanetsu[Note 1]

南越
440.4
 

Echizen

Tsuruga

敦賀
466.1




  •  A   B  Hokuriku Main Line


  • Obama Line




Tsuruga

(Route between Tsuruga and Shin-Osaka not yet finalized.)


  • The boundary between JR East and JR West lies immediately to the north of Jōetsumyōkō Station.

  • Stations in italics are not currently operational.





  1. ^ ab Although the official terminus of the Ryōmō Line is at Shin-Maebashi and that of the Agatsuma Line is at Shibukawa, trains on both lines run through to Takasaki.


  2. ^ Although the official terminus of the Iiyama Line is at Toyono, trains on the line run through to Nagano.




Notes





  1. ^ Tentative name.




Rolling stock




  • E7 series 12-car "F" sets" (since 15 March 2014)[4]


  • W7 series 12-car "W" sets" (since 14 March 2015)


With the start of Nagano Shinkansen services, trains were operated by a new fleet of JR East E2 series 8-car sets. A fleet of 17 new E7 series 12-car trainsets were phased in from March 2014, and these were augmented by a fleet of 10 JR West W7 series 12-car sets introduced from March 2015. The remaining E2 series trainsets were withdrawn from Hokuriku Shinkansen services on 31 March 2017.[5]




Former rolling stock




  • E2 series 8-car "N" sets on Tokyo - Nagano Asama services only


  • E2 series 8-car "J" sets


  • E4 series 8-car "P50/P80" sets as Max Asama


  • 200 series 12-car set F80 during February 1998 only


The original E2 series 8-car "J" sets, primarily used on Tohoku Shinkansen services were also used on some Asama services until they were subsequently lengthened to 10 cars. One specially-modified 200 series set, numbered F80, was used on additional Asama services in February 1998 during the 1998 Winter Olympics held in Nagano. The train was modified to operate on both 25 kV AC 50 Hz and 60 Hz overhead power supplies, incorporated weight-saving measures to comply with the 16 tonne axle load restriction, and included additional control equipment to cope with the 30‰ gradient of the Nagano Shinkansen.[6] Its maximum speed was limited to 210 km/h (130 mph).[6] The last services operated using eight-car E2 series trainsets ran on 31 March 2017, from which date all Asama services were formed of E7 and W7 series trainsets.[7]




History



Nagano Shinkansen


The initial section between Takasaki and Nagano opened on 1 October 1997, in time for the 1998 Winter Olympics in Nagano.


Between May 2012 and March 2014, station platforms on the Nagano Shinkansen had their platform roofs extended to handle the E7 series 12-car trains which entered service in March 2014 ahead of the March 2015 opening of the extension beyond Nagano.[8] The Hokuriku Shinkansen extension from Nagano to Kanazawa opened in March 2015.[8] The 113-km extension from Kanazawa to Tsuruga was approved for construction in June 2012.[9]


From the start of the revised timetable on 15 March 2014, E7 series trainsets were introduced on Asama services.[4] Initially used on seven return services daily, this number was increased to eleven return services daily from 19 April 2014.[4]



Extension beyond Nagano




Construction of the Hokuriku Shinkansen extension near Kanazawa Station in March 2008


Construction of the extension from Nagano to Kanazawa was completed on 24 May 2014.[10] When services commenced in March 2015, the travel time from Tokyo to Toyama was reduced to about 2 hours, with Kanazawa an additional 30 minutes away.[10] Final permission to start construction to Fukui was granted in December 2011, with modification works to Fukui Station already in progress for several years in anticipation of the extension.[11] The extension to Tsuruga was approved for construction on 30 June 2012,[12] and is scheduled to open in fiscal 2022.[13] Beyond Jōetsumyōkō Station, the line is operated by West Japan Railway Company (JR West) instead of East Japan Railway Company (JR East).[14]



Test-running


Test-running on the JR East section of the line between Nagano and Kurobe-Unazukionsen commenced on 1 December 2013, initially at low speeds using the "East i" test train.[15] From 6 December, test-running commenced using 10-car E2 series trainsets, with running speeds gradually increased to the full line speed of 260 km/h (160 mph).[15] Test-running continued until the end of March 2014.[15] Test-running on the entire line between Nagano and Kanazawa (Hakusan Depot) started on 1 August 2014, using the "East i" test train.[16] Test-running using W7 series trains commenced on 5 August 2014, initially at low speed, on the JR West section between Kanazawa and Jōetsumyōkō.[17]



Future plans




Construction of the Hokuriku Shinkansen near Fukui Station in August 2007


The route of the final section from Tsuruga to Osaka was finalized on 20 December 2016 as the 'Obama-Kyoto route.[2] The following four options were under consideration,[13] with a fifth unofficial option suggested by a local politician.[18]




  1. Maibara Route (米原ルート): This involved building a full standard shinkansen track to Maibara Station. It was one third of the length of the Obama Route, and provided good access to both Kyoto and Nagoya. It would have resulted in longer travel time to Osaka than the other options, and trains would have had to use the existing, already near-capacity Tokaido Shinkansen tracks between Maibara and Shin-Osaka.


  2. Kosei Route (湖西ルート): This involved no new track construction; instead, this proposal would have upgraded the Kosei Line to Kyoto, either by regauging or dual-gauging the line to support Mini-Shinkansen, or alternatively utilising Gauge Change Train (GCT) operations. This was the cheapest option, but meant train speeds would likely be limited to a maximum of 160 km/h (100 mph) and hence travel times would have been longer than the other options.


  3. Obama Route (小浜ルート): First proposed in 1973,[13] this route involved building a full standard shinkansen track via Obama and Kameoka. It was the shortest route to Osaka, but also the most expensive (approximately 1 trillion yen), and would have bypassed Kyoto.


  4. Obama-Kyoto Route (小浜・京都ルート): This, the now selected route, was first made public in August 2015, and involves following the proposed Obama Route west as far as Obama and then building shinkansen track southward to link with the Tokaido Shinkansen at Kyoto. Including Kyoto on the route is seen as important to increase tourism.[13]


  5. Maizuru Route (舞鶴ルート): Kyoto politician, Shoji Nishida's proposal from Tsuruga, via Obama, to Maizuru then south-east to Kyoto, eastern Osaka and Kansai Airport.[18] This option was uncosted but would have been the most expensive due to the scale of the proposal. Its case was to provide development to the Maizuru region as per the Japanese national government's policy, with the Maizuru Maritime Self-Defence Force Base and several nuclear power stations put forward as reasonable traffic generators. The option to extend the line south of Kyoto to a new Osaka station (located to the south east of Osaka) and onwards to Kansai International Airport was seen as a means to avoid the congestion of the Tokaido line. It may have served as an alternative route or terminus to Shin-Osaka station for Tokaido line trains, reducing Tokaido line congestion.


A government committee deliberating the proposals decided in April 2016 to narrow the proposed route to three alignments between Tsuruga and Kyoto and two alignments between Kyoto and Shin-Osaka (a northern route through Minoh and a southern route through the Kansai Science City). On 6 March 2017 the government committee announced the chosen route from Kyoto to Shin-Osaka is to be via Kyotanabe, with a station at Matsuiyamate on the Katamachi Line.[19][20] There had previously been discussion of routing the line to Tennoji, a major terminal in southeast Osaka, which would allow an extension of the line to Kansai Airport.[21][22]



Interim plans


In order to extend the benefits of the Hokuriku Shinkansen to stations west of Tsuruga before the line to Osaka is completed, JR West is working in partnership with Talgo on the development of a Gauge Change Train (CGT), which will be capable of operating under both the 25 kV AC electrification used on the Shinkansen and the 1.5 kV DC system employed on conventional lines. The six-car train is due to start trials on the Hokuriku Shinkansen and the 1067 mm-gauge Hokuriku and Kosei lines in 2017. As part of the project JR West has already begun trials with a purpose-built 180 m-long gauge-changer at Tsuruga.[23]



Conventional lines running parallel to the Hokuriku Shinkansen


With the opening of the initial Nagano Shinkansen section in October 1997, the section of the conventional (narrow gauge) Shinetsu Main Line running along approximately the same route between Karuizawa and Shinonoi was transferred from the control of JR East to a newly established third-sector railway operating company, Shinano Railway, becoming the Shinano Railway Line.


With the opening of the Hokuriku Shinkansen extension north of Nagano on 14 March 2015, the conventional lines running along approximately the same route were transferred from the control of their respective JR owning companies to newly established third-sector railway operating companies funded primarily by the prefectural and municipal governments through which the lines pass. A total of 252.2 km (156.7 mi) of route between Nagano and Kanazawa was transferred to four separate operating companies, including 75.0 km (46.6 mi) of the Shinetsu Main Line between Nagano and Naoetsu, and 177.2 km (110.1 mi) of the Hokuriku Main Line between Naoetsu and Kanazawa.[24] Details of the four third-sector operating companies and their respective lines are as shown below.[24]




















































Section Length (km) Former line name Former operating company Date transferred New line name Operating company

Karuizawa - Shinonoi
65.1 Shinetsu Main Line JR East 1 October 1997 Shinano Railway Line
Shinano Railway

Nagano - Jōetsumyōkō
37.3 14 March 2015
Shinano Railway Kita-Shinano Line

Jōetsumyōkō - Naoetsu
37.7 Myōkō Haneuma Line
Echigo Tokimeki Railway

Naoetsu - Ichiburi
59.3 Hokuriku Main Line JR West
Nihonkai Hisui Line

Ichiburi - Kurikara
100.1 Ainokaze Toyama Railway Line
Ainokaze Toyama Railway

Kurikara - Kanazawa
17.8 IR Ishikawa Railway Line
IR Ishikawa Railway


References





  1. ^ 北陸新幹線、来年3月14日開業 東京―金沢2時間半 [Hokuriku Shinkansen to open 14 March next year: Tokyo - Kanazawa in two and a half hours]. Tokyo Shimbun Web (in Japanese). Japan: Chunichi Shimbun. 27 August 2014. Archived from the original on 27 August 2014. Retrieved 27 August 2014..mw-parser-output cite.citation{font-style:inherit}.mw-parser-output .citation q{quotes:"""""""'""'"}.mw-parser-output .citation .cs1-lock-free a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .citation .cs1-lock-limited a,.mw-parser-output .citation .cs1-lock-registration a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .citation .cs1-lock-subscription a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration{color:#555}.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration span{border-bottom:1px dotted;cursor:help}.mw-parser-output .cs1-ws-icon a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/4/4c/Wikisource-logo.svg/12px-Wikisource-logo.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output code.cs1-code{color:inherit;background:inherit;border:inherit;padding:inherit}.mw-parser-output .cs1-hidden-error{display:none;font-size:100%}.mw-parser-output .cs1-visible-error{font-size:100%}.mw-parser-output .cs1-maint{display:none;color:#33aa33;margin-left:0.3em}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-format{font-size:95%}.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-left{padding-left:0.2em}.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-right{padding-right:0.2em}


  2. ^ ab "Hokuriku extension route agreed". Railway Gazette. London. 23 December 2016. Retrieved 23 March 2018.


  3. ^ 北陸新幹線 長野~金沢間開業に伴う運行計画の概要について [Outline of service plans for opening of Hokuriku Shinkansen from Nagano to Kanazawa] (PDF) (Press release) (in Japanese). Japan: JR East & JR West. 27 August 2014. Retrieved 27 August 2014.


  4. ^ abc 3月15日ダイヤ改正と各地の話題  [15 March timetable revision and topics from around the regions]. Tetsudō Daiya Jōhō Magazine (in Japanese). Vol. 43 no. 361. Japan: Kōtsū Shimbun. May 2014. p. 12.


  5. ^ 北陸新幹線「E2系」今月引退…五輪輸送で活躍 [Hokuriku Shinkansen E2 series to be withdrawn this month - Played an active role in transportation during the Olympics]. Yomiuri Online (in Japanese). Japan: The Yomiuri Shimbun. 21 March 2017. Archived from the original on 21 March 2017. Retrieved 22 March 2017.


  6. ^ ab 200系F80編成 [200 series set F80]. Japan Railfan Magazine. Vol. 38 no. 444. Japan: Koyusha Co., Ltd. April 1998. p. 64.


  7. ^ E2系N編成“あさま”の営業運転終了 [E2 series N set Asama services end]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 1 April 2017. Archived from the original on 1 April 2017. Retrieved 3 April 2017.


  8. ^ ab Ito, Tadayuki (3 May 2012). 新幹線ホーム屋根延長へ 長野県内各駅、金沢延伸に備え [Nagano Prefecture shinkansen station platforms to have roofs extended in preparation for extension to Kanazawa]. The Asahi Shimbun Digital (in Japanese). Japan: The Asahi Shimbun Company. Archived from the original on 12 May 2012. Retrieved 3 May 2012.


  9. ^ Kyodo News, "Bullet-train extensions approved", The Japan Times, 30 June 2012, p. 2


  10. ^ ab Igata, Katsuhiro (25 May 2014). "Hokuriku Shinkansen line between Nagano, Kanazawa completed". ajw.asahi.com. Asahi Shimbun. Archived from the original on 28 May 2014. Retrieved 27 May 2014.


  11. ^ [1] Archived 5 January 2012 at the Wayback Machine


  12. ^ [2]


  13. ^ abcd 北陸新幹線延伸「小浜・京都ルート」も検討 JR西日本 [JR West also considering Obama-Kyoto route for Hokuriku Shinkansen extension]. Asahi Shimbun Digital (in Japanese). Japan: The Asahi Shimbun Company. 29 August 2015. Retrieved 29 August 2015.


  14. ^ Kyodo News, "DPJ may OK three new bullet-train sections", The Japan Times, 17 December 2011, p. 1.


  15. ^ abc 北陸新幹線、12月1日から走行試験 [Hokuriku Shinkansen test running to start from 1 December]. Webun (in Japanese). Japan: The Kitanippon Shimbun. 5 October 2013. Archived from the original on 8 October 2013. Retrieved 9 October 2013.


  16. ^ E926形"East-i"が金沢(白山総合車両所)まで走行試験 [Class E926 "East i" test run to Kanazawa (Hakusan Depot)]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing. 4 August 2014. Retrieved 5 August 2014.


  17. ^ 北陸新幹線金沢~上越妙高間でW7系による走行試験が始まる [Test-running using W7 series begins on Hokuriku Shinkansen between Kanazawa and Jōetsumyōkō]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing. 5 August 2014. Retrieved 5 August 2014.


  18. ^ ab Johnston, Eric (24 January 2016). "Politics heating up over Hokuriku Shinkansen Line's undecided last leg". Retrieved 23 March 2018 – via Japan Times Online.


  19. ^ お知らせ : 京都新聞. www.kyoto-np.co.jp. Kyoto News. Retrieved 23 March 2018.


  20. ^ 北陸新幹線“京田辺市ルート”最終調整へ|日テレNEWS24. news24.jp. Retrieved 23 March 2018.


  21. ^ "終点は新大阪駅 与党検討委、北陸新幹線延伸で一本化". The Nikkei. 26 April 2016. Retrieved 28 April 2016.


  22. ^ 北陸新幹線、「けいはんな」通る第3案 京都と大阪間、与党委. The Nikkei. 12 April 2016. Retrieved 13 April 2016.


  23. ^ http://www.railjournal.com/index.php/high-speed/talks-begin-on-hokuriku-shinkansen-extension.html?channel=523%20*%20*


  24. ^ ab Osano, Kagetoshi (March 2015).  北陸新幹線並行在来線各社の姿 [Guide to companies operating conventional lines alongside the Hokuriku Shinkansen]. Tetsudō Daiya Jōhō Magazine (in Japanese). Vol. 44 no. 371. Japan: Kōtsū Shimbun. pp. 28–33.




External links








  • JR East website (in Japanese)


  • JR West website (in Japanese)


  • Ishikawa Prefecture: Hokuriku Shinkansen construction page (in Japanese)


  • Fukui Prefecture: Hokuriku Shinkansen Construction Promotion Division (in Japanese)